Zr-2 Niobium Alloy
video

Zr-2 Niobium Alloy

The corrosion resistance of Zr-2.5Nb alloy has a great relationship with heat treatment. The quenching aging corrosion rate of Zr-2.5 Nb alloy is higher than that of Zr-2 alloy.
Send Inquiry
Chat Now

As a leading supplier and manufacturer in China, GNEE Steel provides cost-effective nickel-based alloy products.

Product Introduction
Niobium Products Application

Zr-2 Niobium Alloy video

Zr-2 alloy was first used on the first nuclear submarine in the United States in 1955. After more than 20 years of practice, it has proven to be reliable as a fuel element cladding material and pressure tube material for boiling water reactors and pressurized water reactors. .
In order to improve the PCI resistance of Zr-2 alloy, the United States has developed Zr-2 tube lining technology, with a pure zirconium layer thickness of 80-100 μm.
Zr-2 alloy is generally used in the manufacture of boiling water reactors.

Niobium  Material Specification

 

Quenching-Cold Processing-Aging Zr-2.5Nb Alloys Corrosion Property
Quenching Temperature/˚C Cold Process Rate/% 500 Aging/h Corrosion Rate After Transition/mg·dm-2·d-1
316˚C Water 360˚C Water 400˚C Steam
880 0 6 0.50 1.38 1.44
880 10 6 0.12 0.40 0.72
880 20 6 0.05 0.20 0.26
880 30 6 0.03 0.10 0.29
880 0 24 0.05 0.43 3.3

Zr-2 Niobium Alloy

Zr-2 Niobium AlloyZr-2 Niobium Alloy

The corrosion resistance of Zr-2.5Nb alloy has a great relationship with heat treatment. The quenching aging corrosion rate of Zr-2.5 Nb alloy is higher than that of Zr-2 alloy. It is higher than the content in CO2 and air. Zr-2.5Nb is not much different from Zr-2 after long-term corrosion (i.e. 30 years) in water medium (i.e. corrosion between 316-400℃). The corrosion resistance of Zr-2.5Nb (including the cold-working state as the corrosion temperature increases) is better than that of Zr-2.

Customer Case

customer visit

Zr-2 Niobium Alloy

Zr-2 Niobium Alloy

FAQ

 

 

 

 

Q: How long is your delivery time?
A: Generally it is 5-10 days if the goods are in stock. Or if the goods are not in stock, it is 15-20 days, depending on the quantity.

Q: Do you provide samples? Is it free or extra?
A: Yes, we can provide samples for free without paying the shipping cost.

Q: What are your payment terms?
A: Payment <=1000USD, 50% in advance. Payment >=1000USD, 30% T/T in advance, balance before shipment. or negotiable

Q: About the product price of Zr-2 Niobium Alloy?
A: Due to cyclical changes in raw material prices, prices vary in different periods.

Hot Tags: zr-2 niobium alloy, China zr-2 niobium alloy suppliers, Niobium Alloy, , , incoloy 800ht pipe,

Send Inquiry

whatsapp

Phone

E-mail

Inquiry